Timber strips are natural materials containing veins and tonal differences. Thus, it is not possible to achieve total consistency of colour and grain in their selection and installation. Timber strips are also subject to thermal expansion and contraction beyond the control of the builder and the Vendor. Natural timber that is used outdoors will become bleached due to sunlight and rain. Thus, the cycle of maintenance on staining will need to be increased as required. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clauses 9 and 17.
Air-Conditioning System
To ensure good working condition of the air-conditioning system, the system has to be maintained and cleaned on a regular basis by the Purchaser. This includes the cleaning of filters, clearing of condensate pipes and charging of gas. The Purchaser is advised to engage his own contractor to service the airconditioning system regularly.
Television and/or Internet Access
The Purchaser is liable to pay annual fee, subscription fee and such other fees to the television and/or internet service providers or any other relevant party or any relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective channels and/or internet access.
Materials, Fittings, Equipment, Finishes, Installations and Appliances
Subject to clause 14.3, the brand, colour and model as specified for all materials, fittings, equipment, finishes, installations and appliances to be supplied shall be provided subject to the Architect’s selection and market availability.
Layout/Location of Fan Coil Units, Electrical Points, Television Points, Data Points, Audio Video Intercom System, Door Swing Positions and Plaster Ceiling Boards
Layout/Location of fan coil units, electrical points, television points, data points, audio video intercom system, door swing positions and plaster ceiling boards are subject to the Architect’s final decision and design.
Warranties
Where warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and/or appliances installed by the Vendor at the Unit, the Vendor will assign to the Purchaser such warranties at the time when vacant possession of the Unit is delivered to the Purchaser. Notwithstanding this assignment, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.
Web Portal and Mobile Applications of the Housing Project
The Purchaser will have to pay annual fee, subscription fee or any such fee to the service provider of the Web Portal and Mobile Application(s) of the Housing Project as may be appointed by the Vendor or the Management Corporation when it is formed.
False Ceiling
The false ceiling space provision allows for the optimal function and installation of M&E services. Access panels are allocated for ease of maintenance access to concealed M&E equipment for regular cleaning purposes. Where removal of equipment is needed, ceiling works will be required. Location of false ceiling is subject to the Architect’s sole discretion and final design.
Glass
Glass is manufactured material that is not 100% pure. Invisible nickel sulphide impurities may cause spontaneous glass breakage, which may occur in all glass by all manufacturers. The Purchaser is recommended to take up home insurance covering glass breakage to cover this possible event. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.
Composite Timber Flooring
Composite timber flooring is manufactured material which contains tonality differences to match natural wood finish. Thus, it is not possible to achieve total consistency of colour and grain in its selection and installation. Composite timber floors are installed in modular planks and are subject to thermal expansion and contraction beyond the control of the builder and the Vendor. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.
Mechanical Ventilation System
Mechanical ventilation fans and ductings are provided to toilets which are not naturally ventilated.
To ensure good working condition of the mechanical ventilation system, the mechanical ventilation system for the exhaust system within internal toilets (where applicable) is to be maintained by the Purchaser on a regular basis.
Prefabricated Bathroom Units
Certain bathroom and W.C. may be prefabricated construction and all penetrations are sealed at manufacturer’s factory prior to installation on site. Any subsequent penetrations are not recommended as they will compromise the waterproofing warranty.
Wall
All wall finishes shall be terminated at false ceiling level. There will be no tiles/ stone works behind kitchen cabinets/vanity cabinet/mirror.
Marble/Limestone/Granite (if applicable)
Marble/limestone/granite (if applicable) are natural stone materials containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity in the marble/limestone/granite (if applicable) as well as non-uniformity between pieces cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However, granite, being a much harder material than marble, cannot be re-polished after installation. Hence, some differences may be felt at the joints. Subject to clause 14.3, the tonality and pattern of the marble, limestone or granite (if applicable) selected and installed shall be subject to availability.
Quartz/ Compressed Marble (if applicable)
Quartz/ compressed marble (if applicable) is an engineered stone surface that comprises of natural extract from the earth. The pigmentation found in these natural extract sometime varies and as a result, the final products are subjected to variations in colour and vein pattern. Like most materials, excessive force, high point loads, pressure or heat may cause thermal shock, discoloration or damage to the surface. Not withstanding this note, the vendor shall remain fully responsible for the performance of its obligations under Clause 9 and 17.
Pneumatic Waste Disposal System
All units are provided with communal refuse hopper at the common area. There is no refuse chute within the Unit.
Prefabricated Pre-finished Volumetric Construction (PPVC)
(Only applicable to all units except #23-01, #23-03, #23-05, #23-07, #23-09, #23-10, #23-13 and #23-15)
Certain unit and/or area may be of prefabricated structurally reinforced concrete volumetric module with complete and/or pre-finished and/or preinstalled concealed electrical services and/or plumbing services and/or air-conditioning and mechanical ventilation (“ACMV”) services and/or sanitary services construction. All walls, penetration openings, electrical services, plumbing services, ACMVs services and sanitary services are predesigned and/or concealed and/or pre-route prior to installation on site. No hacking of any of the structural walls of the Unit is allowed.
Acoustical Measures
For compliance with authorities’ requirements, certain unit and/ or area may be provided with acoustical measures, such as window restrictor(s), sliding door restrictor(s), acoustic ceiling(s) and/or acoustic blind(s) etc. The ceiling height of such Unit and/or areas will be reduced in the event of acoustic measures are required. Concrete soffit and surfaces enclosed within acoustic ceilings will be left in their original bare condition.
(Only applicable to units at Block 6, #01-01 to #23-01, #01-07 to #23-07, #03-08 to #22-08, Block 8, #03-09 to 23-09, #01-10 to #23-10, #01-15 to #23-15, #01-16 to #22-16, #01-17 to #22-17 and such other units as may be designated by the authorities.)
Tiles
Selected tile sizes and tile surface flatness cannot be perfect and are subject to acceptable range described in Singapore Standard SS483:2000.
Mobile Phone Reception
Telephone reception on mobile phones within the Housing Project is subject to availability/provision of satellite/wireless coverage by the respective mobile telephone network service providers and is not within the purview/control of the Vendor.
Engineered Timber Flooring
Engineered timer flooring is a natural material with variation in appearance, colour and grain patterns within one species. Thus, it is not possible to achieve consistency of colour and grain opposed to a photographic layer in the selection and installation. The engineered timber board can display some, frequent knots which shall form part of the characteristic of the timber. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clauses 9 and 17.
Home Fire Alarm Device (HFAD)
HFAD(s) is (are) provided to give early warning of a fire by sounding an alarm to alert the occupants. The purchaser is responsible for ensuring that the HFAD(s) is (are) kept in good working condition. The Purchaser is advised to test the HFAD(s) regularly to ensure the HFAD(s) is (are) working.
Fibre Broadband
The Vendor shall endeavor to procure an infrastructure for the service provider for connection from its network to the Unit/Building and/or the Housing Project (or any part of parts thereof ), so as to enable the Unit/Building and/or the Housing Project to obtain the Fibre Broadband. All subscription fee/charges for the service provided shall be borne by the Purchaser. However, in the event despite reasonable efforts being made by the Vendor, the Vendor is unable to procure any service provider to provide the said connection, thereby resulting in there being no Fibre Broadband available in the Unit/Building and/or the Housing Project, the Vendor shall not be liable to the Purchaser for any compensation or for any damages, costs, fees, expenses or losses whatsoever, or howsoever incurred, by virtue of the Purchaser being unable to obtain the Fibre Broadband in the Unit/Building and/or the Housing Project.
Digital TV Service/Reception
A Building Master Antennae System is provided with necessary cablings or connections to enable the purchaser to obtain digital TV services. The purchaser will have to ensure that their television sets are digital ready and compatible in order to view the Free-To-Air (FTA) channels.
The availability/provision of reception coverage by the respective media network service providers is not within the purview/control of the Vendor.